Sample BOQ layout (illustrative)
| No. | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in foundation, all soils | cft | 1850 | ||
| 2 | PCC 1:4:8 below footings, 4" thk | cft | 162 | ||
| 3 | RCC M20 in footings | cft | 360 | ||
| 4 | RCC M20 in columns | cft | 222 | ||
| 5 | Reinforcement TMT, cut, bent, placed | MT | 4.70 | ||
| 6 | Brickwork 9" thk in CM 1:6 | cft | 2055 | ||
| 7 | Internal plaster ½" thk CM 1:6 | sqft | 7750 |
Quantities are illustrative. Rate and amount columns are left open for your rates.
What is included
- Item-wise quantity estimation for included construction work.
- Excavation, backfilling and earthwork quantities.
- Concrete and RCC quantity calculations.
- Reinforcement steel quantity estimates, where included.
- Brickwork, plastering and flooring quantities.
- Painting and finishing quantities, where included.
- BOQ with item descriptions, units and calculated quantities.
- Excel format for quantity review and rate entry.
Please note: Material rates, labour rates and final project costs should be separately specified if required.